Solar for New Build Homes

Solar & Battery Systems for New Build Homes

Building a new home gives you a unique, once-in-a-lifetime opportunity to design an energy system that is perfectly integrated into the architecture of your house. Retrofitting solar after construction often means visible exterior wiring, limited conduit routes, and missed structural optimisations.

By partnering with Sunergy Solar & Batteries during your pre-construction phase, you unlock four major advantages:

  • 100% Concealed Cabling: Pre-wiring wall cavities before plastering ensures all electrical cabling, solar conduits, and battery connections remain invisible inside your walls.

  • 3-Phase Power Maximums: New builds allow you to easily specify a 3-phase electrical supply, enabling larger solar array sizes (up to 15kW–30kW) and significantly higher grid export allowances.

  • Lower Construction Costs: Installing solar mounting systems while scaffolding is already in place dramatically reduces labor, safety, and equipment hire costs compared to retrofitting.

Contact Us
home under construction

Pre-Build Integration vs. Post-Build Retrofitting

Feature / BenefitPre-Build Integration (Sunergy)Post-Build Retrofit
Conduit & Wiring AestheticsCompletely hidden inside wall cavitiesSurface-mounted exterior conduits
Electrical Supply OptimisationEasy 3-phase wiring for faster EV charging & larger solarCostly main switchboard upgrades often required
Inverter & Battery LocationCustom alcove/garage space planned into blueprintsPlaced wherever space allows post-construction
Builder CoordinationDirect liaison between Sunergy and your site supervisorHomeowner must coordinate trades after handover
Cost SavingsCombined scaffolding & reduced installation laborHigher labor costs and retrofitting fees
Contact Us
Solar Panels

Technical Considerations for New Home Solar

1. 3-Phase Electrical Supply

If your site permits, always request a 3-phase connection from your builder. While single-phase homes are often capped at 5kW to 6.6kW solar inverters, a 3-phase system allows you to install 10kW, 15kW, or larger solar arrays with full battery integration and 22kW EV fast-charging support.

2. Strategic Battery & Inverter Placement

Modern home batteries (such as Tesla Powerwall or hybrid modular storage systems) require optimal environmental conditions to maximise battery lifespan. We work with your architect to allocate a sheltered, well-ventilated location—such as a dedicated garage nook—pre-wired with heavy-duty power conduits.

3. Smart Roof Pitch & Orientation

During the roof design stage, positioning major roof faces toward North or East/West split configurations ensures maximum solar generation throughout the day. We advise your builder on roof pitch and tile/tin fixing systems prior to roof installation.

4. EV Charger Pre-Wiring

Even if you don’t own an electric vehicle today, pre-wiring an EV cable from your main switchboard to your garage during framing costs a fraction of what it would cost to install down the road.

Contact Us
Inverter Repair
Inverter Repair - Sundery Bendigo
Happy Customer - Inverter Repair

Why Choose Sunergy Solar & Batteries?

Unlike brokers who subcontract installations to third parties, Sunergy Solar & Batteries uses in-house, accredited local installers. This ensures strict quality control, full accountability, and seamless communication with your home builder.

  • Direct Builder Collaboration: We speak builder language. We coordinate directly with your site supervisor to stay on schedule with construction stages.

  • Tier-1 Quality Components: We only install proven, high-efficiency solar hardware with direct Australian manufacturer warranty backing.

  • Local Expertise: Based locally, we understand exact grid network requirements, local weather dynamics, and regional compliance rules.

Contact Us

Frequently Asked Questions

Should I install solar panels during construction or wait until after handover?

Installing solar during construction is highly recommended. Pre-wiring during construction allows electrical cables to be concealed within wall cavities, utilizes existing site scaffolding to lower labor costs, and ensures your system is active on move-in day.

Can I bundle solar and battery storage into my main home build mortgage?

Yes. When you contract solar and battery installation through your new build process, the cost can often be included in the total build contract, rolling your renewable energy investment directly into your standard home mortgage rate.

Do I need to tell my home builder before signing the contract?

Yes. Informing your builder early allows them to include a “solar pre-wire provision” in the construction schedule and gives Sunergy Solar & Batteries time to submit structural roof and grid connection plans before construction starts.

Why Choose Sunergy Solar for Your New Build Home?

Don’t get left in the dark—protect your home from unexpected outages with a reliable solar battery system from Sunergy Solar. We’ll help you choose the right solar and battery sysem for your new build home.

Contact us today for a free quote and get peace of mind with solar and batteries that keep your new Bendigo home running.

Get a free quote

or give us a call

03 5443 3664
10 Top Tips to get a great solar & battery solutions

FREE E-GUIDE

Download our free eBook, “10 Top Tips for Choosing Solar and Battery Solutions” for insights from industry experts with over 20 years of experience in Bendigo and beyond.

DOWNLOAD